This is our Production Manager Matt Longo installing one of our USC field sites for the 4" Deringer 20/30 in the horizontal orientation. Normally one would not need a crane to install a 42lb valve however, we are replacing a competitors valve with a much longer lay length and had to add spools on both ends of our valve to make up for our short lay length. |
|
No comments:
Post a Comment