Friday, October 18, 2013

First Production Run

All injection molded components for the Dual-Action™ Check Modules used in the 2 1/2", 3", and 4" Deringer 20/30/40/50 have successfully passed first article inspection and are cleared for use in production. The first production run is shown below.

The first production run of custom 1/2" lead free ball valves for the smallest and lightest backflow bypass in the industry.

The first production run of the industry's first handleless tamper resistant 1/2" and 3/4" test cocks.

The first production run of custom lead free bronze components for the smallest and lightest backflow bypass in the industry.

No comments:

Post a Comment